Renovations / Byblos

Under Design

Name Summary

Block A Building Level 9 New Offices

The scope of work is to refurbish both sides of the attic of Block A Building to house the new offices; total area to be refurbished is 870 m2. This project is planned for execution to meet the space requirements as per the short term reallocation plan.

CHSC Simulation Center

The scope of work includes relocating the current IT multimedia room, transforming the space into a control room for the Simulation Center. A B-Line Simulation Management System will be installed in the Control Room of the Chagoury Health Sciences Center, Level 5.

BA L1 Parking

The scope of work includes surfacing and leveling the parking area with poured concrete.

BA L5 PP Offices

The scope of work is to refurbish existing offices allocated to Physical Plant for better internal grouping along with adding a working space and offices for newly recruited staff. 

SCI Entrance Gate

The scope of work includes providing a new security kiosk along with the needed facilities and upgrading the entrance to the campus from Science Building Parking.

 

Under Execution

Name Summary

BA L5 IT Offices

The scope of work is to refurbish the existing Byblos IT Offices for better internal grouping along with adding a working space and offices for newly recruited staff.

Completed

Name Summary

SCI Labs Maintenance Work

The scope of work included minor upgrading work for the Natural Sciences department’s labs in the Science Building, level 3.

Protection Office 2016-2017

The scope of work includes needed renovation work to relocate the Protection office to the Gate House as per the University Short-Term Reallocation Plan.

CHSC Library Additional Study Carrels/Entrance 2016-2017

The scope of work included the addition of study carrels to best meet the needs of students.

RHB L4 Dormitories Study Rooms 2016-2017

The scope of work included upgrading works to provide study rooms and a computer lab in Residence Hall B.

UP L3 Warehouse 2016-2017

The scope of work was to refurbish room#320 of the Under-Ground parking for storage purpose, transforming it into two separate warehouses: one for the Hospitality Services and the other for the Student Services.

ARC L1 Laser Printing-Room Refurbishment 2016-2017

The scope of work was to refurbish the existing space to accommodate the new laser printing machine.

BA L6 HR Offices 2016-2017

The scope of work is to refurbish the existing Byblos Human Resources Department in Block A Building Level 6. This project has been initiated to maximize space distribution and provide additional administrative offices. The improvements will increase the efficiency of work flow and provide a more aesthetically pleasing work environment.

BA Level 3 Biology Lab 2016-2017

The scope of work was to create a Biology lab in Block A level 3 by applying the needed civil and finishing, elector-mechanical work and IT. This lab is needed to cater to academic needs of the School of Arts & Sciences.

FCC L3 Room 301 OCE Offices 2015-2016

The scope of work was to transform the existing lounge in Frem Civic Center into an open space office unit that would fit six desks with counters and cabinets for the use of the Outreach and Civic Engagement Office.

Lecture Capture Project 2015-2016

The scope of work is to render Classrooms number CHSC 4204, CHSC 5100, CHSC 5510, ZEH 401, ZEH 405, ZEH 508, ARC 502 & SCI 403 into smart lecture capture classrooms, in which classroom-based activities are recorded and made available for review after class, reflecting the latest pedagogical developments. 

SCI L6 Additional Offices 2015-2016

The scope of work included creating offices to accommodate the VP-HR & US Office and a visiting office for the Legal Counsel in Science Building, Level 6.

BA L6 FM Offices 2015-2016

The scope of work was to refurbish half of the wing in Block A Building, Level 6 in order to group the FM team.

Parking Lots A, B & K 2014-2015

Major renovation for an area of 12,100m2 has been completed, including fencing, parking lining, irrigation system, excavation, reinforced concrete work, lighting system and related electrical work, security kiosks, emergency phones, barriers supply, and installation of CCTVs and multimedia equipment, etc., as well as the asphalting of Parking lots A & B.

RHB Level 4 Music and Dancing Rooms 2014-2015

The music and dancing rooms were relocated from Block A Building to Residence Hall B in order to accommodate more offices in Block A Building.

ARC L1 Renovation 2014-2015

Workshops and labs allocated to the School of Architecture and Design in Architecture Hall were refurbished. The project was designed and executed with energy conservation features (e.g., efficient lighting, occupancy sensors for AC and lighting control, etc.).

ARC L3/L4 Offices 2014-2015

Architecture Hall offices on Levels 3 and 4 were renovated and remodeled to accommodate new faculty members.

RHB Waterproofing for Terraces 2014-2015

The scope of work included resolving water leakages into the dormitories and the external stairs of Residence Hall B.

BA Level 7 Renovation

Existing rooms in Block A Building were refurbished  to create 16 offices for new users in addition to providing toilets and services area. Half of Level 7 was renovated to cater to the space needs of the School of Arts and Sciences.

BA L4, 5, 6 and 7

Levels 4, 5, 6 and 7 of Block A Building were refurbished to accommodate occupants moving in from the Tohme-Rizk Building.

SON & Computer Lab Modifications

The architecture of the School of Nursing was modified, in addition to some modifications to the computer lab allocated to the School of Medicine.

SC Offices Renovation

Student Center offices allocated to the Dean of Student Services were renovated and remodeled. 

Future

Name Summary
There are no future projects at the present time.